DESIGNATION NAME NATIONALITY | Cementing Technical Engineer Mustafa Sarbast Abdulqader Kurdish/Iraqi | |
| EDUCATION |
| YEARS ATTENDED | SCHOOL/COLLEGE/UNIVERSITY | DIPLOMA/DEGREE |
| 2004-2008 | Kurdistan High School, Erbil | High School |
| 2008-2012 | Chemical Engineering, Koya University | BSc Chemical Engineering |
| QUALIFICATION | Bachelor of Chemical Engineering |
| YEARS OF EXPERIENCE IN OIL AND GAS INDUSTRY | 11 Years |
| DETAILS OF EXPERIENCE |
| MONTH & YEAR | CONTRACTOR POSITION | BRIEF DESCRIPTION OF RESPONSIBILITY / EXPERIENCE |
April-2022 Present | Account Manager, Sprint Oil & Gas Services | - Supports the marketing strategy of the service delivery organization.
- Technical and administrative support in tenders related to cementing, CT, stimulation and downhole tools.
- Defines along with Management: sales goal, coordinates specific sales plans for the promotion of existing services
and the introduction of new services, and makes corresponding follow-up effective. - Coordinates plan and conducts technical seminars for clients.
- group studies, and participates in presentations i.e. DWOP, PWR.
- Makes regular client visits, document them, and follow-up with operations management.
- Keep abreast of clients plans and problems.
- Analyzing and defining market requirement for new technologies.
- Assists in Engineers’ training in appropriate areas. Participate actively on mentoring plans assigned by company.
- Performing job audits on regular basis for key and strategic clients.
- Prepares proposals for submission to clients and negotiates contractual terms with clients and ensure effective
closure of sales cycle as per Job Cycle Responsibility Matrix. - Ensure the job cycle for the respective jobs is completed.
- Monitors market expectations, requirements, trends, and contributes to collecting market input for research and
engineering planning and budgeting. - Ensures that Company policies are well understood, accepted and followed by the personnel under his supervision.
- Maintain the technical control over the jobs ongoing at locations at assigned client and also to ensure that
customer satisfaction is met up to the levels of or above acceptance. - Educating and training of operations team as and when required to enable them handle customer independently
at location. - Forecasting of the WCS additives with a margin of 3 months to run locations efficiently.
- Assisting in development of company’s relationship programs with local bodies and employees.
QHSE (Responsibility, Authority, Accountability including Occupational QHSE) - Ensuring the risk assessment of job, in technical and operation domains met the actual job conditions and
accordingly documented with client and supervisor at location prior job execution. - Conducting HSE, Qaulity and Process audits of ongoing jobs as and when required.
- Active participation in QHSE (LPT, recognition programs, safety campaigns etc.)
- Review and ensures SQ compliance prior and during the job execution.
- Ensure that job execution is performed in a safe, efficient and professional manner.
- Attend QHSE fundamental training as required by business line and clients.
- Strive for Service Quality and Service Quality Plan implementation.
- Participate in well site job risk analysis and continual improvement programs in the base, to ensure service quality
is up to client satisfaction with zero injury and spills - Ensure that all Sprint Policies and standards, all applicable Business Line Services rules and procedures related to
their work are complied with. |
| Sep2017 – April2022 | Technical Engineer, Sprint Oil & Gas Services | - Write recommendations, operation programs, and post job analysis for cementing jobs (Primary Casings, Squeeze, abandonment plugs, Liners, kick off plugs and remedial)
- Redesign cementing jobs according to diagnostics performed on the field.
- Supervise Cementing Technicians on location to ensure proper blending of fluids and data acquisition.
- Provide engineering support to customer and conduct on-location job quality control testing.
- Analyzing CBL/VDL logs after each job .
- Providing Centralization recommendation to client
- Overlook lab operations and analyze test results for cement designs.
- Prepare commercial and technical proposals for client.
- Cost control and follow up on invoices until approval confirmed from customer.
- Asset Operation Supervisor for arranging equipment and Job plan executing.
- Follow up with quality control measures.
- Presenting technical presentations to Clients.
- Support Stimulation and CT Department technically.
- Follow Up Client HSE Reports and Quality Control
- Worked as engineer incharge for key clients in Kurditan i.e. Gazprom, Rosneft, Genel Energy, WesternZagros, DNO, KAR
|
| Aug2014 –Sep2017 | Field Engineer, Kar Group | - Taken Responsibility For Well Cementing ,Casing and Completion.
- Design Program and Supervising all Cement Jobs Conducts at Kar Fields.
- Casing Design
- Experienced in over all Drilling process.
- Experienced Well Completion (Completion accessory, Setting Packer ,Well head Installation )
- Basic Well Stimulation and Coil tubing
- Oil Well Fire extinguishing.
|
| Aug2012-Jun2014 | Field Engineer Trainee, OiLSERV, Cementing Department | - Design all type of Cement Jobs (Primary and remedial Cementing)
- Operating Cement Unit and Pumping all types of Fluids (cement, Mud, brain, water, acid,...)
- Pressure test for equipment and treating Irons.
- Well Stimulation jobs (Acidizing ,..)
- Standalone Supervising primary and remedial cement jobs.
- Ability of running all basis lab tests in cementing lab (TT, UCA FLC, Rheology)
- Using CEMPRO and CenntraDesign SOFTWARE
|
| Jun2012-Aug2012 | Lab Engineer, TTOPCO | - Sampling and testing of crude oil in production facility.
- Quality control of testing procedure
- Handling basic Troubleshooting
- Calibration and maintenance of lab equipment
- Data analysis and reporting
|
| | | |
| TRAININGS |
| 2012 | S.A.F.E training course, arranged by Oilserv |
| 2012 | OSI introduction course, arranged by Oilserv |
| 2012 | Introduction of Petroleum Industry, arranged by ‘’Guld Reservoir Modeling Technology’’ |
| 2013 | Basic Pumping Course, arranged by Oilserv |
| 2013 | Basic and Intermediate Cementing course |
| 2019 | Basic Well Logging Workshop, arranged by SPRINT |
| 2019 | Advanced well intervention, Well cementing, Well production workshop, arranged by SPRINT |
| 2019 | Internal Audit Training, arranged by SPRINT |
| 2019 | Time Management Training, arranged by SPRINT |
| 2020 | Cement Bond Log Interpretation, arranged by ThroughBOND-SPRINT |
| 2020 | Cementing Shoe, TEST, arranged by ThroughBOND |
| 2020 | Cementing ‘’Top Keys to Success’’, arranged by ThroughBOND |
| 2020 | Entrepreneurship in the Oilfield, from SPE |
| 2020 | Killer Communication Skills, from SPE |
| 2020 | The Mentoring Journey, from SPE |
| 2020 | Optimizing Matrix Stimulation Treatments for Carbonate Completions, , from SPE |
| 2021 | Applied Well Logging Techniques, TPS-SPRINT |
| 2021 | CT Velocity String/ Size Analysis for Optimum Well Flow, TPS-SPRINT |
| 2022 | Emotional Intelligence, by Cambridge Education-SPRINT |
| 2022 | Leadership program, by Cambridge Education-SPRINT |
| 2022 | Negotiation Skills, by Cambridge Education-SPRINT |
| 2022 | Attended 11 Safety courses, by Safety Skill program-SPRINT |
- Basic First Aid for Oil and Gas Personnel
- Chemical Safety
- Confined Space and Engulfment Awareness for Oil and Gas Personnel
- Driver Safety
- Electrical Safety_NFPA 70E for Oil and Gas Personnel
- Emergency Response
- Fall Protection Awareness
- Fire Fighting
- Globally Harmonized System (GHS)
- H2S Awareness & Breathing Apparatus Level II
- Hand and Pinch Point Safety
- Hazardous Wase Awareness (RCRA)
- Heat Stress in Oil and Gas Operations
- Lock Out / Tag Out (LOTO)
- Manual Handling Training
- Office Ergonomics
- Permit to Work (PTW)
- Personal Protective Equipment (PPE)
- Rigging Safety for Oil & Gas Operations
- Safety Orientation and Risk Identification and Reporting
- Slipping and Tripping Hazards
- Working from Heights
|
| PAPERS |
- Shielding Spacer and Primary Cementing Techniques for High Permeability Fractured Reservoirs-Feb 2023.
- Making Workovers Easy and Cost Effective: Turning Old Ways into New Opportunities – September 2021
- Adaptation of Technologies Making Clean out Operations Environment Friendly and Cost Effective - Converting Failure into Success Using New Type of Fluidic Oscillator – September 2021
- The remedial design for 9-5/8’’ intermediate casing two stage job for a deep gas well in Kurdistan Region, published in IEEE organization and presented in IEEE conference in April, 2017.
- Production of Ethanol from Iraqi Date (Awarded as best project in Annular Engineering exhibition in Engineering faculty, KOYA university May,2012).
|
| LANGUAGE PROFICIENCY |
FLUENCY IN ORAL AND WRITTEN: ENGLISH ARABIC TURKISH KURDISH | Fluent Fluent Intermediate Native |