Title: Mechanical site Engineer.2019- till now
Supervision Work to Installation the AL-RUMAILAH COMBINED CYCLE 730
MW POWER
PLANT PROJECT-BASRA With RAZ Company for General Contracting The equipment is provided by Siemens in Germany& TFA SIEMENS & Sin hydro Corporation Ltd –CHINA & KAR Electrical Power Production Trading FZE – OWNER:
a-Responsible of Installation for all:-
1-Installation MAIN POWER BUILDING – STEAM TURBINE GENERATOR
EQUIP. STEAM TURBINE HP/IP & LP & GENERATOR
A-Installation AUXILIARY EQUIPMENT IN STG HOUSE.
B-Installation TURBINE PROPER AUXILIARY EQUIPMENT.
2-Installation Heat Recovery Steam Generation – 5 HRSG UNIT. A-
Installation Feed Water Pump HP & IP & Re Circ. Water. B-Installation Inlet & Outlet Duct & Chimney Stack. 3-Installation CW.PUMP HOUSE & Cooling Tower SYS. 4-Installation Raw Water Treatment SYS.
5-Installation Fire Fighting SYS.
6-Installation Central Control Building EQUIP. 7-Installation Hydrogen Generation SYS.
8-Installation Air Compressor EQUIPMENT SYS. 9-Installation Industrial Waste Water Treatment Room. 10-Installation Common Pipe Rack Steel Structurers. 11-Installation Condensate Polishing Equipment Shed.
B-Responsible of PR-commissioning of all
1- HRSG Hydrostatic test sys (HP&LP&IP SYS.)
2- HRSG Chemical cleaning of (HP&LP&IP SYS.)
3- Steam blowing
4- Oil flushing of (lube oil & seal oil & Hydraulic oil) sys.

معدل تقريبي: $15 لكل ساعة

تجربة

Title: Mechanical site Engineer.2019- till now
Supervision Work to Installation the AL-RUMAILAH COMBINED CYCLE 730
MW POWER
PLANT PROJECT-BASRA With RAZ Company for General Contracting The equipment is provided by Siemens in Germany& TFA SIEMENS & Sin hydro Corporation Ltd –CHINA & KAR Electrical Power Production Trading FZE – OWNER:
a-Responsible of Installation for all:-
1-Installation MAIN POWER BUILDING – STEAM TURBINE GENERATOR
EQUIP. STEAM TURBINE HP/IP & LP & GENERATOR
A-Installation AUXILIARY EQUIPMENT IN STG HOUSE.
B-Installation TURBINE PROPER AUXILIARY EQUIPMENT.
2-Installation Heat Recovery Steam Generation – 5 HRSG UNIT. A-
Installation Feed Water Pump HP & IP & Re Circ. Water. B-Installation Inlet & Outlet Duct & Chimney Stack. 3-Installation CW.PUMP HOUSE & Cooling Tower SYS. 4-Installation Raw Water Treatment SYS.
5-Installation Fire Fighting SYS.
6-Installation Central Control Building EQUIP. 7-Installation Hydrogen Generation SYS.
8-Installation Air Compressor EQUIPMENT SYS. 9-Installation Industrial Waste Water Treatment Room. 10-Installation Common Pipe Rack Steel Structurers. 11-Installation Condensate Polishing Equipment Shed.
B-Responsible of PR-commissioning of all
1- HRSG Hydrostatic test sys (HP&LP&IP SYS.)
2- HRSG Chemical cleaning of (HP&LP&IP SYS.)
3- Steam blowing
4- Oil flushing of (lube oil & seal oil & Hydraulic oil) sys.

التعليم

B.Sc Mechanical Engineering - University of Technology 2000-IRAQ

محترفون من نفس قطاع التصنيع/الميكانيكا مثل Saeed Eng.

محترفون من قطاعات مختلفة بالقرب من Rūbah, البصرة

المستخدمون الآخرون الذين يطلق عليهم Saeed

;