More than 15 years of Experience in the field of electrical engineering.
• Knowledge of Programmable Logic Controller and Motor Controls.
• Expert in troubleshooting of different electrical and control circuits.
• Experience in installation of Switchgear, transformers, substation outdoor equipment, LCC & protection panels, instruments, DC charger & UPS, cables, MEP ( ILP, OLP, FA, CCTV, PA, ACU, PABX, VOIP, ISP ), heat trace, EOT Crane, Cathode protection, lightening, earthing.
• Reading electrical design specifications and technical drawings.
• Conduct inspection for electrical material deliveries.
• Checkthedrawinganddocumentsusedatthesiteforapprovalsandcompliancewith the project requirements.
• Prepare daily / weekly surveillance reports, non-conformance reports and make verification the same.
• Planning, Scheduling and supervision of preventive maintenance for electrical facilities.
• Provide expert advice and assistance to design, construction and maintenance engineers and operating personnel on all matters pertaining to the electrical fields. • Observe electrical safety in testing such as effective grounding, tags on equipment and issuing of workorders.

تجربة

Site Manager for GIS 132/33Kv Substation at QASCO/Siemens, Al-KUT, Al-EMARA
August 2021 — June 2022
Responsibilities and Duties:
1- Plan, organize, direct, control and evaluate construction projects from start to finish according to schedule, specifications and budget.
2- Attend meeting with clients and their representative to inform them of progress on the project.
3- Maintaining health and safety of the staff including site inspection.
4- Checking design drawings with architects, surveyors andengineers.
5- Communication with any consultants, subcontractors, supervisors and others involved in the project.
6- Managing the construction site on a day-to-day basis, including supervising the
Labor force, monitoring subcontractors, checking materials, inspecting work and quality control.
7- Hiring and managing staff for the project.
8- Dealing with any unexpected problems that may occur during the project.
9- Direct the purchase of MEP materials.
10- Supporting team with Siemens Supervisor for install GIS 132Kv Switchgear + Local control panel + pre-commissioning & testing.
10- Install GIS 33Kv Switchgear + Pre-commissioning & testing ( Contact resistance, CB open close timing, CT, VT, SF6 Due point analyzing & 33Kv HV )
11- AssemblyofMaintransformer63MVA&Auxiliarytransformer250KVA+ Pre- commissioning & testing.
12- Install 48V/110V DC Charger, Inverter panels & assembly of Battery Bank + Pre-commissioning & testing.
13- Install 132Kv & 33Kv Protections panels + Pre-commissioning & testing.
14- Assembly of Capacitor Bank 5MVAR
15- Install & assembly outdoor equipment’s (OHL Gantry with beams, CVT, Surge Arrester, Line Trap, NCT & EARTHING Switch) + Pre-commissioning & testing.
16- Install ETL600 PLC, FOX615 MUX & SCADA panels, supporting team with Siemens Supervisor for Pre-commissioning &testing.

17- MEP works EPC (HVAC Samsung Lighting System, SAM4000E PABX, NAFFCO /Shield Fire Alarm & INFINOVA CCTV Systems.
 

Deputy Electrical Construction Manager at Power Engineering World/GE/ENI, Basra
June 2018 — July 2021
Responsibilities and Duties:
1- Planning and coordinating the work from start to finish, including organizing the schedule of work.
2- Managing the construction site on a day-to-day basis, including supervising the labor forces, checking materials, inspection work and overseeing quality control.
3- Ensuring the construction work is delivered on time.
4- Checking design documents withengineers.
5- Maintaining regular communication and attending meetings with the clients to inform them of progress on the work.
6- Dealing with any unexpected problems that may occur during work.
7- Installation of 6.6 kV Air Insulated Switchgear (AIS) Panels.
8- Assembly of unit’s Electricalmodules.
9- Completion of Electrical equipment’s in Air Intake System, Acoustic Enclosure & GT Exhaust Gas System from Installation to Pre- Commissioning and Energizing.
10- Assembly of unit’s transformer (Step-Up Transformer 132 kV, Station Service Transformer 15 kV & Auxiliary Transformer).
11- Completion of Fire Protection System from Installation to Pre-Commissioning.
12- Installation of Instrument Devices such as Turbine Thermal Block I&C (Instrumentation) (Pressure, Temperature, Level, Flow, Thermocouples, RTDs and VibrationSensor)WTPAnalyzers(TURBIDITY,PH,CONDUCTIVITY,ORP,CHLORINE,DOand CONCENTRATION).
13- Completion of Heat Tracer System for Gas Station Pipe Lines.
14- Completion of Cathode Protection system for Tanks.
15- Completion of Lightening System for Buildings & Fuel Gas Station.
16- Completion of Electrical work for MELONI Auxiliary Cranes from Installation to Pre-Commissioning and Energizing.
 

ElectricalConstructionEngineeratPowerEngineeringWorld/ABB/Shell,BASRA/ Al- ZUBAIR
January 2015 — December 2017
Responsibilities and Duties:
1- Installation Instruments JBs for turbine As per Drawing.
2- Pulling & Termination Cables according to sitespecifications.
3- Installation of Air Insulated Switchgear (AIS) Panels.
4- Assembly of Auxiliary transformers.
5- Managing the construction site on a day-to-day basis, including supervising the labor forces.
6- Checking Materials & consumablesdelivery.
7- Attends meetings with the clients to inform them of progress on the work.
8- Dealing with any unexpected problems that may occur during work.
9- Completion of Fire Protection System from Installation to Pre-Commissioning.
10- Installation of Instrument Devices such as Turbine Transmitters (Pressure, Temperature, Level, Flow, Thermocouples, RTDs and Vibration Sensor).
11- Calibration of turbine Gas Detection Sensors.
12- Completion of CCTV & PAGA system from Installation to Pre-Commissioning.
 

IT Manager, Fire Protection Engineer, Electrical Engineer at Hyundai/MOE, Baghdad
May 2011 — December 2014
Responsibilities and Duties:
1- Installation and configuration of software and hardware computer and server systems. 2- Installation and configuration CCTV security camera (Panasonic, GE, PROLINE).
3- Installation and configuration PABX system (Panasonic, AASTRA, SOHPO IS3000).
4- Installation and configuration Access Control Unit System (GE).
5- Installation and configuration Public Address System (LELAS).
6- Installation and configuration of the communication system (Intercom System VOIP). 7- Fiber Optic Splicing, Jointing and installation of fiber distribution frame FDF.

9- Installation and configuration of Fire Alarm System Modules (Edwards EST3): - SIGA-CR Control Relay Module - SIGA-CT1 Single Input Module - SIGA-CC1 Single Input Signal Module.
10- Installation the Triple Infra-Red Flame Detector for in tank and configuration with fire alarm module to energize the foam station pump to contain the fire in tank.
11- Installation the motorized valve for the in-tank firefighting system and configuration with fire alarm module and Triple Infra-Red Flame Detector to cool down the in tank heat by the sprinkler system.
12- Installation the proportional for in tank fire fighting system and configuration with fire alarm module and the deluge valve to mix the foam with water to contain the fire in tank. 12- Installation the heat detectors in shelter roof and configuration with fire alarm module to contain the fire in equipment.
13- Team Leader for commissioning GRS station.
IT Manager, Control Engineer at Al-BAGHDADIA Channel, Baghdad
April 2007 — January 2011
Responsibilities and Duties:
1- Installation and configuration software and hardware computer and server systems 2- Installation and configuration CCTV security camera (Panasonic, PROLINE)
3- Installation and configuration Mikrotik System
4- Installation and configuration internetserver
5- Installation and configuration PABX system(Panasonic)

التعليم

Bachelor of engineering at University of Technology, Baghdad
June 2002 — June 2006
Electronics & Telecommunication Engineering

محترفون من نفس قطاع الهندسة\ الهندسة المعمارية مثل ahmed Ameen

محترفون من قطاعات مختلفة بالقرب من Basrah, Basrah District

المستخدمون الآخرون الذين يطلق عليهم ahmed

وظائف بالقرب من Basrah, Basrah District

  • abbas

    شركه المتسوق المعقل العراق

    تم العثور عليها في: beBee S2 IQ - منذ 3 أيام


    abbas الجبيلة, العراق فريلانسر

    مطلوب دليفري · اوقات الدوام من 11 صباحا الى 7مسا · جمعه استراحه · يوميه اكثر من 25 · ...

  • TeacherOn

    Arabic home tutor

    تم العثور عليها في: beBee S2 IQ - منذ 6 أيام


    TeacherOn Basrah, العراق دوام جزئي

    Hi there, Noor · سلام عليكم والحمدلله وبارك ومرحبا بكم · I'm looking for 40 hours' Intermediate-level Arabic language lessons over two weeks, starting May 5. · I'm comparing with a place in Kuwait. Please provide me your most competitive rates for tuition. Are you centrally loca ...

  • vip coffee

    معهد فدك النموذجي عن حاجته الى مدرسات الجبيلة العراق

    تم العثور عليها في: beBee S2 IQ - منذ أسبوع


    vip coffee الجبيلة, العراق فريلانسر

    مطلوب مدرس لغه انكليزيه و لغه عربي ورياضيات لطالب صف سادس اعدادي .. منطقة السليلو .. الاتصال واتس اب على شكرا ...